« More refit news | Main | Lazy Jacks »

March 02, 2009

Nearly Ready

NINJOD came out of the shed towards the end of last week. Consequently instead of heading south to the Solo sailing festival Saturday and Sunday were spent completing jobs from the list.

The electronics have been re-commissioned
New clutches have been installed. New cams were installed for some of the existing ones.
The new water ballast pump was installed
The cuddy was installed
The new stove and gimbals were installed
Solar panel cabling and controller were installed
A huge amount of cabin bags were installed
The steps and chart table were sanded down and re-varnished.

We ( Jan, Phil and myself ) finished late on Sunday evening. I just managed to grab some snaps.

IMG_0090.JPG

IMG_0088.JPG

NINJOD will be put back into the water this week. The rig is due to be tuned, the lazy jack system is due to be installed, the wind generator platform will be installed this week and finally I will get my headsails back with hanks installed.

Posted by ninjod at March 2, 2009 07:08 AM

Comments

Very nice!! When do you need your winches done??

Give me a shout and I will come up and take them apart!

Chriswah

Posted by: Chris Whatley at March 2, 2009 04:51 PM

Post a comment




Remember Me?